01a In the context of new projects, Rotarco has recently supplied 650 gas units to the Angola Election Commission, with the aim of feeding 650 electoral assemblies scattered throughout the country, in order to ensure the normal functioning of all acts of census and Elections.
02 Supply of 5 groups without soundproof canopy (open), making a total of 6,250 kVA of total installed capacity and available for one of the largest factories of soft drinks, juices, water, energy drinks and alcoholic beverages, Refriango in Luanda, Angola. This installation shows the particularity of the groups supplied with the radiators at a distance, as it was not possible to discharge the engine cooling air through the radiator coupled to the group outside the control panel. It was a very complex installation for all involved, but not at all discouraging, as it was the first time that Rotarco participated in a project of this magnitude. Since then, the development of new projects has been a constant challenge.

 

 